Shower Repair Package

Just need it fixed – change the tiles in the shower and re doing the waterproofing and fix the leak.

BENEFIT

When you just need it fixed Repairing a leaking shower to prevent further damage ideal for rental properties or passing a building inspection.

Please Note: If the property contains asbestos, you will be required to do a full strip out.

CONTENTS

SCOPE OF WORKS

  • Strip Out - Remove shower screen, shower head, shower taps/mixer, remove shower wall and floor tiles, remove shower walls and floor sheets, remove screed, remove rotted timber.
  • Carpenter - Repair wood rot, sheet walls, sheet floor (if required).
  • Plumber - Refit existing shower head and taps/mixer.
  • Waterproofer - Shower Floor, Shower Walls.
  • Tiler - Screed Floor, Tile Floor, Tile Walls to existing height, silicone.
  • Glazier - Install Shower Screen
  • Supervisor - Run and Monitor the project and trades.

INCLUDED

  • Skip Bin - rubbish removal
  • Delivery of tiles and products

SUPPLIED ITEMS

Ceramic Floor Tiles
200 x 200
Semi Frameless Shower Screen 900 x 900mm

FULL ITEM LIST

  • Ceramic Floor Tiles 200 x 200 Matt 1m2
  • Ceramic Wall Tiles 200 x 200 Gloss 5m2
  • Square Waste
  • Streamline Angle (Modern Day Hob)
  • Semi Frameless Shower Screen 900 x 900mm

**Shower Head and Taps are Reused

Package Example $6,600.00 Inc GST

Based on: Shower Size 900x900mm with two walls.

Book Consultation

Things to consider

Upgrades
Alterations
Portable Bathroom
3d Plans
Compliance
Form 16 Waterproofing Certificate

What We Offer

We have the capability of turning your bathroom into a piece of art.

Demolition

Removing all fittings e.g. vanity, bath, shower screen, tap ware, existing tiles etc.

RE-SHEETING OR RENDERING

When removing tiles, the existing wall behind will often come off with the tiles.

OTHER TRADES

A plumber, carpenter or electrician are needed in the process of a bathroom renovation.

WATERPROOFING

Wet areas are required to be waterproofed according to the Australian Standard. Certificate is provided after completion.

BEDDING

This is required in most bathrooms to provide levelling or fall to drainage.

Tiling

Installation of the clients desired tile according to the Australian Standard

Grouting

Filling the joints with a colour matching cement based grout.

SILICONE

To finish off the tiling with a sealant where tiles meet each other for a smooth finish.

BATHROOM FIXTURES

Items such as a shower screen, bath, tap fittings, vanity etc.

Latest Bathroom Renovation Projects

What to expect from our
Bathroom Renovation
team

  • Efficient quotes
  • Prompt communication
  • On time arrival
  • Well dressed in uniform
  • The use of floor protection during the project
  • A clean and tidy work area
  • Respect for our clients and their property
  • Supervisor point of contact for the project
  • Professional trades that have been through our qualifying process
  • Work carried out in a tradesman like manner
  • Quality control systems and processes
  • Sign off stages and checklists to ensure trades are meeting our expectations
  • Regular communication
  • Organised and efficient planning for maximum productivity
  • Will always get approval for any variation work before proceeding
  • Workmanship warranty
  • Public liability insurance
  • QBCC home warranty insurance

Customer Bathroom Renovation Journey

IDEA

When you enquire with us the first step in the process is to ask you some questions to understand your needs. We will send you some information that explains what you need to know and the next steps.

SOLUTION

We will contact you to discuss further your requirements and answer any questions you may have, and the next steps moving forward. If what we are offering is the right fit, we will book an onsite consultation.

DESIGN

At your consultation we’ll discuss our brochure of packages, go through your design, and layout, of tiles, fittings and fixtures. To ensure the best use of space and practicality.

PLAN

Your new design will be drawn up into a plan you will receive a detailed scope of works and separate product supply quote. We will follow up with you to discuss or make any changes or updates.

DELIVER

Once you send us acceptance to proceed, we’ll send you what happens next steps where you have the opportunity to view and select your final product selections and make any final changes before, we issue the contract. 

Our Bathroom Reno Reviews

Looking for a quality Bathroom Renovation?

ENQUIRE NOW

Enquiry

Shower Repair Package

Contact Details

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.